My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-24_REVISION - M1977321
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977321
>
2024-05-24_REVISION - M1977321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 7:56:33 AM
Creation date
5/28/2024 10:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Revision
Doc Date
5/24/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Summit Brick & Tile Co - Julie Welte
Type & Sequence
SI2
Email Name
JLC
AME
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001 Page 2 of 2 <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5944 <br /> Adjusted unit production: 608.01 LCY/hr <br /> Adjusted fleet production: 1216.02 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.424/LCY <br /> Total job time: 1.33 Hours <br /> Total job cost: $688 <br />
The URL can be used to link to this page
Your browser does not support the video tag.