My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-24_REVISION - M1977321
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977321
>
2024-05-24_REVISION - M1977321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 7:56:33 AM
Creation date
5/28/2024 10:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Revision
Doc Date
5/24/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Summit Brick & Tile Co - Julie Welte
Type & Sequence
SI2
Email Name
JLC
AME
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#001 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Discarded Brick Highwall Pushdown 3:1,550' length,15' deep <br /> Site: Native/Pierre Mine Permit Action: 2024 Inspection Permit/Job#: M1977321 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 4/5/2024 County: Pueblo Filename: 001 <br /> User: JLC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series 11 <br /> Horsepower: 240 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $114.76 NA <br /> Operating Cost/Hour: $91.98 100 <br /> Ripper own. Cost/Hour: $9.06 NA <br /> Ripper op. Cost/Hour: $1.76 35 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $257.59 <br /> Total Fleet Cost/Hour: $515.18 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 1,393 <br /> Swell factor: 1.165 <br /> Loose volume: 1,623 LCY <br /> Source of estimated volume: 2024 Inspection,field and satellite measurements <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,022.9 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: -5 % <br /> Average site altitude: 4,800 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock, 50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 1.000 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.