Laserfiche WebLink
Thor Energy I Standard Minerah Inc <br /> Ground Hog Modified NOI DRMS P-2021-008 <br /> Sec 21.T 45N R 18W NAPM <br /> 9 May 2024 TA <br /> Equipment Equipment <br /> Type 1 Type 2 <br /> PADS-REGRADE RECONTOUR Backhoe Excavator <br /> Har to Hours to <br /> om*a .Cost p�to Cost per <br /> Borehole ID Pad Size(h2) Activity task Pad to Pad Pad Total <br /> Regrade pad to approx <br /> PDH GHWBRA A 3600 original contour 2 210 0 0 210 <br /> Regrade pad to approx <br /> PDN GHWBRA B 2500 original contour 1 5 157 5 0 0 157 5 <br /> Regrade pad to approx <br /> PDH GHWBRA C 2500 original contour 1 5 157 5 0 0 157 5 <br /> Regrade pad to approx <br /> PDH GHWBRA D 2500 original contour 1 5 157 5 0 0 157 5 <br /> Regrade pad to approx <br /> PDH GHWBRA E 2500 original contour 1 5 157 5 0 0 157 5 <br /> Regrade pad to approx <br /> PDH GHWBRA F 2500 original contour 1 5 157 5 0 0 157 5 <br /> Regrade pad to approx <br /> PDH GHWBRA G 2500 original contour 1.5 157.5 0 0 157 5 <br /> 18600 1155 1156 Total <br /> 0 43 acre 346 5 <br /> 1501 5 <br /> Equipment Type 1 Cost per Hr IS) <br /> Cat 420 backhoe or squib, 105 <br /> Cost based on 2023 invoice <br /> Equipment Type 2 Cost per lir(S) <br /> Cat 325 Excavator or equiv 170 <br /> Cost based on 2023 invoice <br /> Third Party Burden Percent markup <br /> 30% <br /> Ft2 in an acre 43560 <br />