My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-24_REVISION - P2021008
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2021008
>
2024-05-24_REVISION - P2021008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:57:09 AM
Creation date
5/28/2024 8:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2021008
IBM Index Class Name
Revision
Doc Date
5/24/2024
Doc Name
Request For Modification
From
Thor Energy PLC
To
DRMS
Type & Sequence
MD1
Email Name
LJW
THM
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thor Energy 11 Standard Minerals,Inc., l <br /> Gravid Hot NOI DRMS P_-2021-008 <br /> Sec. <br /> 21,T.49N.,R.18W.,NMPM 1 <br /> 9 M 2024 TA .,�—_— <br /> Summary(including Third Party Burden) <br /> Borehole Sealing $932 <br /> Pads-Regrade_Recontour $1.502 <br /> Roads-Regrade_Recontour $4,665 <br /> Revegetation $3,042 <br /> Equipment Mob-Demob $2,470 _ <br /> Total $12,610 Total <br /> Total Reclaimed Area 0.80 acre <br /> Thor Energy/Standard Minerals Inc <br /> Ground Hog Modified NOI DBMS P•2021-008 <br /> Sec 21.T 45N.R 18W.NMPM <br /> 9 May 2024 TA <br /> BOREHOLE SEALING <br /> BACKFILL WITH CUTTINGS <br /> Borehole ID Total Depth(f•Hous Labor Backbit Cost(S) <br /> PDH GHWBRA Al 340 1 0 20 <br /> PDH GHWBRA A2 340 1 0 20 <br /> PDH GHWBRA A3 340 1 0 20 <br /> PDH GHWBRA A4 340 1 0 20 <br /> PDH GHWBRA B 340 1 0 20 <br /> PDH GHWBRA C 340 1 0 20 <br /> PON GHWBRA 0 340 1 0 20 <br /> PDH GHWBRA E 340 1 0 20 <br /> PDH GHWBRA F 340 1 0 20 <br /> PDH GHWBRA G 500 1 0 20 <br /> 200 Subtotal <br /> Productivity <br /> Labor-feet backfilled per hour <br /> 300 <br /> Labor-cost per tour(Si <br /> 20 <br /> BOREHOLE TOP SEAL <br /> Bottom plug Bentonite Cost per Bentonite Labor Cost Total <br /> Borehole IO (1) Cost(ea) Fill(ft) Ft(2) Cost per hole(S) Cost <br /> PDH GHWBRA Al 1 9 4 7 28 10 47 <br /> PDH GHWBRA A2 1 9 4 7 28 10 47 <br /> PON GHWBRA A3 1 9 4 7 28 10 47 <br /> PDH GHWBRA A4 1 9 4 7 28 10 47 <br /> PDH GHWBRA B 1 9 4 7 28 10 47 <br /> PDH GHWBRA C 1 9 4 7 28 10 47 <br /> PDH GHWBRA 0 1 9 4 7 28 10 47 <br /> PDN GHWBRA E 1 9 4 7 28 10 47 <br /> POH GHWBRA F 1 9 4 7 28 10 47 <br /> PDH GHWBRA G 1 9 4 7 28 10 47 <br /> POH GHWBRA H 1 9 4 7 28 10 47 <br /> 517 Subtotal <br /> 717 Total <br /> Productivity 215 1 Third Party Burden <br /> Labor-Cost to set top seal 932 1 Grand Total <br /> 10 <br /> Labor-cost per hour(Si <br /> 20 <br /> Third Party Burden Percent markup <br /> 30% <br /> 1)Plastic Plug from CGS Mule <br /> 2)Rounded up from 2023 DRMS reclamation estimate <br />
The URL can be used to link to this page
Your browser does not support the video tag.