Laserfiche WebLink
Thor Energy I Standard Minerals Inc <br /> Sec 23 Modified NOI DRMS P-2021-009 <br /> Sac 23 T 45N,R 18W,NMPM <br /> 9 May 2024 TA <br /> Summary(including Third Party Braden) <br /> Borehole Sealing $200 <br /> Pads-Regrade-Recontour $478 <br /> Roads-Regrade_Reconto r $314 <br /> Revegetation $60 <br /> Equipment Mob-Demob S2 470 <br /> Total S3 522 Total <br /> Total Reclaimed Area 0 13 we <br /> Thor Energy I Standard Minerals Inc <br /> Sec 23 Modified NOI URNS P-2021-009 <br /> Sec 23 T 45N R 18W,NMPM <br /> 9 May 2024 TA <br /> BOREHOLE SEALING <br /> BACKFILL WITH CUTTINGS <br /> Borehole ID Total Depth(N•Hors Labor BackfSl Cost(1) <br /> PDH Sec23WBRA Al 500 1 5 30 <br /> PDH Sec23WBRA B 500 1 5 30 <br /> 60 Subtotal <br /> Productivity <br /> Labor-feet backfired per tour <br /> 300 <br /> Labor-cost per hour(5) <br /> 20 <br /> BOREHOLE TOP SEAL <br /> Bottom plug Bentonite Cost per Bentonite Labor Cost Total <br /> Borehole ID (1) Cost(ea) Fill(ft) Ft(2) Cost per hole(S) Cost <br /> PDH GHWBRA Al 1 9 4 7 28 10 47 <br /> PDH GHWBRA B 1 9 4 7 28 10 47 <br /> 94 Subtotal <br /> 154 Total <br /> Productivity 46 2 Third Party Burden <br /> Labor-Cost to set top seal 200 2 Grand Total <br /> 10 <br /> Labor-cost per hoe(5) <br /> 20 <br /> Third Party Burden Percent markup <br /> 30% <br /> 1)Plastic Plug from CGS Mule <br /> 2)Rounded up from 2023 DBMS reclamation estimate <br />