Laserfiche WebLink
(2) Reclamation Estimate <br /> Brown Quarry, Road &Yard Reclamation Estimate <br /> Replace Subsoil Length Width Depth Cubic Yards Cost/CY Total Cost <br /> Road 3000 12 2 2,667 0.5 $ 1,333.33 <br /> Yard 150 125 2 1,389 0.5 $ 694.44 <br /> $ <br /> Quarry 440 150 0 0 0.5 <br /> Rock Check Dam 50 30 3 167 0.5 83.33 <br /> $ 2,027.78 <br /> Topsoil Length Width Depth Cubic Yards Cost/CY Total Cost <br /> Road 3000 12 0.5 667 0.5 $ 333.33 <br /> Yard 150 125 0.5 347 0.5 $ 173.61 <br /> Quarry 440 150 0.5 1,222 0.5 $ 611.11 <br /> $ 1,118.06 <br /> Unit <br /> Acres Cost Total Cost <br /> Seed <br /> Disk 2.8 102 $ 285.60 <br /> Weed Control 2.8 200 $ 560.00 <br /> Seed Cost 2.8 180 $ 504.00 <br /> Broadcast Seed 2.8 230 $ 644.00 <br /> Straw 2.8 590 $ 1,652.00 <br /> Crimp 2.8 70 $ 196.00 <br /> $ 3,841.60 <br /> Cost Summary <br /> Subsoil $ 2,027.78 <br /> Topsoil $ 1,118.06 <br /> Seed $ 3,841.60 <br /> Subtotal $ 6,987.43 <br /> Burden 18% $ 1,257.74 <br /> Total Reclamation Cost $ 8,245.17 <br />