My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-04-29_REVISION - M2022001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2022001
>
2024-04-29_REVISION - M2022001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2024 7:50:19 AM
Creation date
4/30/2024 7:43:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022001
IBM Index Class Name
Revision
Doc Date
4/29/2024
Doc Name
Request for Technical Revision
From
Red Tierra Equities
To
DRMS
Type & Sequence
TR1
Email Name
JPL
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D- MINING PLAN <br /> The information provided in this Exhibit is intended to satisfy the requirements outlined in Section 6.4.4 of <br /> the Colorado Mined Land Reclamation Board Construction Material Rules and Regulations: <br /> (a) Description of the method(s)of mining to be employed in each stage of the operation as <br /> related to any surface disturbance on affected lands; <br /> The permit area includes a significant deposit of sand and gravel located in the alluvium of the <br /> South Platte River in Weld County. The site is located south of Highway 66,west of Weld <br /> County Road 19, north of Weld County Road 28 and east of Weld County Road 17. It <br /> encompasses 631.58 acres (plus or minus)and consists of seven slurry wall lined,and an <br /> unlined silt pond. Prior to starting construction of any slurry wall,a Technical Revision to <br /> update the site bonding will be applied for and will include the slurry wall design report. <br /> Site Preparation: <br /> Initial disturbance on the property will be stripping overburden in the eastern portion of Cell 8 <br /> to establish the plant footprint. Concurrently with establishing the plant,the first phase of the <br /> Fresh Water Pond and the first phase of the Siltation Pond will be stripped of overburden and <br /> mining will commence in these phases once the plant has been established. <br /> After the initial preparation of the Plant, Fresh Water Pond and Siltation Pond,the Concrete <br /> Batch Plant and Asphalt Plant areas will be established and constructed. Customer roads will <br /> be established from the entrance to the plant areas. <br /> The current house on the west side of the property will be utilized as the office and a shop will <br /> be constructed in the early phases of site development.A parking area for employees will be <br /> constructed adjacent to the office and shop area. <br /> Mining: <br /> Scrapers will strip the topsoil and overburden material from a given phase and place stockpiles <br /> in the processing area. Any excess material not needed for reclamation may be sold or <br /> hauled off-site during the life of the mine. There will be no mining below the groundwater table <br /> until the slurry wall is complete,tested and approved for each slurry wall lined cell. For unlined <br /> cells,there will be no mining below the groundwater table until an approved Substitute Water <br /> Supply Plan(SWSP)has been obtained. <br /> Each slurry wall lined phase will be dry-mined using scrapers, bulldozers,front-end loaders, <br /> excavators, or similar equipment. The Fresh Water Pond and Siltation Pond will be unlined an <br /> wet mined with excavators. <br /> Mining at the site will progress in eight major stages comprised of minor phases expected to <br /> last approximately one year.A map depicting the phases can be found in Exhibit C-5. <br /> Initial Phase—The initial phase will consist of mining overburden in the future aggregate plant <br /> location and the eastern portion of the Silt Pond. Mining in these cells will establish two (2) <br /> recharge ponds for interim use prior to construction of site facilities described in"Stage 1" <br /> below. The work will be performed with an excavator to load semi-trucks. No on-site <br /> processing will occur during this phase. The initial phase is expected to last two(2)to three <br /> (3)years. The initial phase site access point will be off of Weld County Road 44. <br /> Section 20—Gravel Mine—MLRB 112 Permit Amendment <br /> Exhibit D-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.