Laserfiche WebLink
EXHIBIT L.RECLAMATION COST(Section 20 Initial Phase) <br /> Activity Quantity Units Unit Costs Cost <br /> A. Area Surrounding Lined Reservoirs(Equipment:Dozers,Scrapers,Water truck) <br /> 1 Scarify Ground 43 Acres $ 150.00 $ 6,390.00 <br /> 2 Spread 6"topsoil(Disturbed areas outside of ponds and slopes) 6,541 CY $ 1.50 $ 9,811.50 <br /> 3 Seed and Mulch(Disturbed areas outside of ponds and slopes) 9 Acres $ 900.00 $ 8,100 00 <br /> ret Costs <br /> • -: &Profit <br /> Performance Bond(2.02%)-Based on DRMS estimate $ 490 89 <br /> Performance Bond(3.07%)-Based on DRMS estimate $ 255.17 <br /> Job Supenntendent(240 hours @$75/hr)-Based on DRMS estimate $ 18,000.00 <br /> Contractor Mob and DeMob(3%)-Based on DRMS estimate not including slurry wall $ 729.05 <br /> Contractor Overhead and Profit(10%)-Based on DRMS estimate not including slurry wall $ 2,430.15 <br /> Sadotal 21,905.25 <br /> ._ • «Amount direct+p&P $ 46,296.75 <br /> E :ineed &' Man ant <br /> Financial warranty processing(legal/related costs)($500) $ 500.00 <br /> Engineenng Work and/or contract/bid preparation(4 25%) $ 1,963 79 <br /> Reclamation management and/or administration(5%)-Based on DRMS estimate $ 2,31034 <br /> Contingency(3%) $ 729.05 <br /> Subtotal 5,503.17 <br /> otal Indirect Costs 27,408.42 <br />