Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 2 of 2 <br /> 140 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 10.00 $29,655 <br /> Reclamation <br /> 141 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 7.14 $6,635 <br /> Removal <br /> 142 Mobilize/Demobilize Equipment for Site MOBILIZE 1 14.00 $18,433 <br /> Maintenance <br /> 150 Yearly site maintenance SITEMAINT 1 140.00 $14,720 <br /> ENANCE <br /> SUBTOTALS: 1544.33 $1,488,038 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $30,058 <br /> Performance bond: 1.05 Total= $15,624 <br /> Job superintendent: 772.16 Total= $50,252 <br /> Profit: 10.00 Total= $148,804 <br /> TOTAL O&P= $244,739 <br /> CONTRACT AMOUNT(direct+O&P)_ $1,732,777 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 5.23 Total= $90,624 <br /> Reclamation management and/or administration: 4.00 $69,311 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $405,174 <br /> TOTAL BOND AMOUNT(direct+indirect)_ $1,893,212 <br /> CIRCES Cost Estimating Software <br />