My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-03-12_REVISION - C1981022 (18)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2024-03-12_REVISION - C1981022 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 8:50:03 AM
Creation date
3/13/2024 8:14:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
3/12/2024
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN8
Email Name
LDS
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Site-wide Reclamation Cost Estimate Update <br /> Site: Elk Creek Mine Permit Action: RN8 Permit/Job#: C1981022 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 2/13/2024 County: Delta Filename: CO22-000 <br /> User: LDS <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill and Regrade Elk Creek Facilities Area DOZER 3 90.27 $102,967 <br /> 004 Backfill and Grade Material Used to Widen Access DOZER 3 1.53 $1,749 <br /> Road <br /> 005 Backfill and Regrade Elk Creek Mine Area DOZER 3 101.64 $115,938 <br /> 006 Move Fill Material from Elk Creek Mine to Elk SCRAPERI 1 45.33 $51,377 <br /> Creek Faciliti <br /> 008 Backfill and Regrade Primary Riprap Borrow Area DOZER 3 4.75 $5,423 <br /> 009 Backfill and Regrade Secondary Riprap Borrow DOZER 3 12.05 $13,739 <br /> Area <br /> O10 Backfill and Regrade Elk Creek Mine Rock Safety DOZER 3 23.52 $26,832 <br /> Catch Bench <br /> Oil Backfill and Regrade Temporary Conveyor DOZER 3 11.87 $13,542 <br /> Corridor <br /> 012 Regrade Expanded Elk Creek Mine Fan Bench DOZER 3 1.06 $1,205 <br /> 034 Rip All Surface Facility Areas RIPPER 3 29.04 $36,237 <br /> 041 Regrade Lower Power Line Access Road EXCAVATE 1 41.01 $8,466 <br /> 042 Regrade Pond C Access Road DOZER 3 3.85 $4,391 <br /> 050 Finish Grade All Disturbed Areas GRADER 1 53.85 $14,576 <br /> 066 Remove Upper Hubbard Creek Sediment Pond DOZER 1 2.99 $1,135 <br /> 067 Regrade East Bench Pond DOZER 1 0.61 $231 <br /> 068 Excavate/Backfill Pond C Wall Area EXCAVATE 1 1.67 $345 <br /> 071 Remove Sewage Leach Field DOZER 1 0.61 $231 <br /> 072 Regrade Pond A DOZER 1 0.61 $231 <br /> 073 Regrade Pond B DOZER 1 26.02 $9,891 <br /> 075 Regrade Pond E DOZER 1 4.39 $1,668 <br /> 077 Regrade Pond F DOZER 1 2.26 $858 <br /> 090 Replace Topsoil from Stockpile to Previously SCRAPERI 1 1.86 $2,112 <br /> Disturbed Elk A <br /> 095 Replace Topsoil from Stockpile to II West Refuse SCRAPERI 1 1.09 $1,236 <br /> Pile Road <br /> 096 Replace Topsoil from Stockpile to Expanded Elk DOZER 3 0.13 $153 <br /> Creek Mine Fa <br /> 103 Replace Topsoil from Stockpile to Pond F,Ditches DOZER 1 2.86 $1,086 <br /> and Plunge <br /> 120 Broadcast Seed Mine Site REVEGE 1 216.50 $92,910 <br /> 121 Re-seed Drill Pads and Roads 49.82 acres @ 2% REVEGE 1 49.82 $897 <br /> failure <br /> 130 Demolish and Remove All Mine Facilities DEMOLISH 1 600.00 $885,255 <br /> 131 Plug and Seal 7 Monitoring wells BOREHOLE 1 42.00 $23,914 <br />
The URL can be used to link to this page
Your browser does not support the video tag.