My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-03-12_REVISION - C1981022 (18)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2024-03-12_REVISION - C1981022 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2024 8:50:03 AM
Creation date
3/13/2024 8:14:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
3/12/2024
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN8
Email Name
LDS
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Diversions and Conveyance of Overland Flow <br /> 1. Specific drainage control plans are presented on pages 2.05-34 to 38 of the <br /> PAP. Ditch locations are shown on Map 2.05-M4 of the PAP (sheets 1 <br /> through 6, Vol. 3). <br /> C. Stream Channel Diversions <br /> 1. The Division has approved the diversion of an intermittent stream (Elk Creek). <br /> This decision is based on a finding that the proposed diversion meets the <br /> requirements of 4.05.18 and 4.05.4, applicable local, State, and Federal statutes <br /> and regulations and that the diversion is designed to safeguard public safety and <br /> to minimize adverse impacts to the hydrologic balance [4.05.4(1) and (4)]. <br /> Specifically, the following findings were made: <br /> (a) The stream channel will be reconstructed in accordance with the <br /> requirements of Rule 4.05.4(4). <br /> (b) During and after mining, the water quantity and quality from the stream <br /> section within 100 feet of the surface coal mining operations shall not be <br /> adversely affected. <br /> (c) The reclamation plan provides for the reestablishment of appropriate <br /> riparian vegetation. <br /> 2. The Division has approved the diversion of an intermittent stream (Bear <br /> Creek). This decision is based on a finding that the proposed diversion meets <br /> the requirements of 4.05.18 and 4.05.4; applicable local, State and Federal <br /> statutes and regulations; and that the diversion is designed to safeguard public <br /> safety and to minimize adverse impacts to the hydrologic balance [4.05.4(1) <br /> and (4)]. Specifically, the following findings were made: <br /> (a) The stream channel will be reconstructed in accordance with the <br /> requirements of Rule 4.05.4. <br /> (b) During and after mining, the water quantity and quality from the stream <br /> section within 100 feet of the surface coal mining operations shall not be <br /> adversely affected. <br /> (c) The reclamation plan provides for the reestablishment of appropriate <br /> Mountain Shrubland vegetation. <br /> D. Sedimentation Ponds <br /> 1. Disturbed areas in the main facilities area and yard are treated by two <br /> sediment ponds, Ponds A and B. Pond C controls sediment from the approved <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.