My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-23_REVISION - M1977324
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977324
>
2024-02-23_REVISION - M1977324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 11:16:44 AM
Creation date
2/27/2024 11:15:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977324
IBM Index Class Name
Revision
Doc Date
2/23/2024
Doc Name
Request for Technical Revision
From
Summit Brick Company
To
DRMS
Type & Sequence
TR2
Email Name
HR1
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> ,� 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> r.76 <br /> TR-2 <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET HR1 <br /> File No.: M- 1977-324 Site Name:Stocks Clay Mine <br /> County F re m o n t TR# (DRMS Use only) <br /> Permittee:Summit Brick & Tile Co. <br /> Operator(If Other than Permittee): q <br /> Permittee Representative:J u l i e W e l to <br /> Please provide a brief description of the proposed revision: Provide Mining Map that updates and clarifies <br /> the planned phased operation of the mine. Also, to increase the allowed disturbed acreage from 20 acres to 35 <br /> acres and to provide notice of beginning to disturb areas in Phase 2. See additional narrative and Mining Map. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Rea uired TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 ✓ <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.