Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) <br /> condition: <br /> Overland trails will be raked and seeded upon completion of the drill program each <br /> original contours, covered with the stockpiled topsoil, raked and seeded upon <br /> completion of the drill program each season (or as soon as possible after drill program). <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br /> seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br /> mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br /> land or State Land Board if on state land. <br /> A. Plant name and seeding rate: <br /> Plant Name Seeding Rate (PLS/Acre) <br /> Crested Wheatgrass 3.00 <br /> Intermediate Wheatgrass 7.00 <br /> Pubescent Wheatgrass 7.00 <br /> Form 2—Public File Page 10 of 14 <br />