Laserfiche WebLink
List of Figures <br />Figure 1. Location of the mining permit project. <br />Figure 2. Structures and neighbors one half mile distance from the mining permit. <br />Figure 3. Alternative blasting level criteria. (Source Modified from figure B-1. Bureau of Mines R18507) <br />Figure 4. Stratigraphic Column <br /> <br />List of Tables <br />Table 1. Scaled distance factor <br />Table 2. Flyrock control issues. <br />Table 3. Factors within the blaster-in-charge’s control that influence ground vibrations. <br />Table 4. Factors outside the blaster-in-charge’s control that influence vibrations. <br />Table 5. Procedures to Procedures to reduce Ground Vibrations Regarding Blast Design Factors. <br />Table 6. Procedure to reduce ground vibrations regarding blast implementation factors <br />Table 7. Factors beyond the blaster-in-charge’s control that influence air overpressure. <br />Table 8. Procedures regarding blast design factors to reduce air overpressure. <br />Table 9. Procedures regarding blast implementation factors to Reduce air overpressure. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />