My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-02_REVISION - M1982121 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982121
>
2024-02-02_REVISION - M1982121 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 4:43:17 PM
Creation date
2/2/2024 4:28:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
Revision
Doc Date
2/2/2024
Doc Name
Adequacy Review Response
From
RMR Aggregates, Inc
To
DRMS
Type & Sequence
TR6
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rocky Mountain Industrials <br /> ROCKY MOUNTAIN 6200 S. Syracuse Way, Suite 450 <br /> 1 N ❑ U S T R i A L S Greenwood Village,CO 80111 <br /> November 29, 2023 <br /> Robert Wagner <br /> RMR Aggregates, Inc. <br /> Rocky Mountain Industrials <br /> 6200 S. Syracuse Way, Suite 450 <br /> Greenwood Village,CO 80111 <br /> Amy Yeldell <br /> Russ Means <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE:Technical Revision Application Pertaining to the April 12, 2023 Stipulated Agreement <br /> Dear Ms. Yeldell and Mr. Means, <br /> RMR Aggregates, Inc. (RMRA) is submitting this Technical Revision (TR) in accordance with the <br /> requirements of the Stipulated Agreement, dated April 12, 2023, between the Colorado Division of <br /> Reclamation, Mining, and Safety(CODRMS) and RMRA.That agreement required RMRA to submit a TR <br /> to COD RMS containing a geotechnical stability plan for the mine site and methods and monitoring plans <br /> for ensuring long-term rock stability and safety at the operation. RMRA has previously provided <br /> CODRMS with our completed geotechnical report, and the Division responded with some follow-up <br /> questions pertaining to the report.This TR submission includes a revised version of the report with the <br /> requested answers/clarifications included.The submission also includes a brief narrative of the mining <br /> plans and methods as well as stability monitoring plans and safety measures for the site.Those plans are <br /> contained in the following pages. <br /> We are ready to discuss the plans further with you and provide any additional information or <br /> clarifications,where necessary. <br /> Sincerely, <br /> 7 �') I(7��— <br /> Robert T. Wagner <br /> VP, Engineering <br /> Rocky Mountain Industrials <br /> rwagner@ rackymountainindustrials.com <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.