My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-02_REVISION - M1982121 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982121
>
2024-02-02_REVISION - M1982121 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 4:43:17 PM
Creation date
2/2/2024 4:28:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
Revision
Doc Date
2/2/2024
Doc Name
Adequacy Review Response
From
RMR Aggregates, Inc
To
DRMS
Type & Sequence
TR6
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pg C <br /> �w r . <br /> *t: COLORADO DIVISION OF RECLAMATION,MINING AND SAFETY <br /> * � 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> 7 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> FileNo.: 1%4- 1982-121 site Name: Mid-Continent LST Mine <br /> county Garfield TR# DRMS Use on <br /> Perrnittee: RMR Aggregates, Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: R o b e rt Vila fi n e r <br /> Please provide a brief description of the proposed revision: <br /> RMR Aggregates, Inc. is submitting this TR in accordance with the terms of the Stipulated <br /> Agreement, entered into April 12, 2023. <br /> As defined by the Minerals Rules, a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.