My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-25_GENERAL DOCUMENTS - M1995005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1995005
>
2023-07-25_GENERAL DOCUMENTS - M1995005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:54 PM
Creation date
1/3/2024 2:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995005
IBM Index Class Name
General Documents
Doc Date
7/25/2023
Doc Name Note
Ocean Wave Project ( Alps Jct)
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Performance and Payment Bonds. A Performance and Payment bond is required if the <br /> amount bid is $150,000.00 or greater. The CONTRACTOR shall furnish a labor and material <br /> payment bond for 100 percent of the original contract price and a performance bond for 100 <br /> percent of the original amount of the contract. The bonds are required by State Law, Title 24- <br /> 105, 202-203, C.R.S., as amended. The bonds shall be submitted using the State forms. A <br /> certified or cashier's check or bank money order may be accepted in lieu of the bonds. If a surety <br /> other than a bond is used, the State will hold fifty percent (50%) of the surety until the final <br /> settlement date and fifty percent (50%) for six (6) months after the final settlement date. <br /> Retainage. If the project exceeds $150,000.00, 5% retainage will be withheld until the project <br /> has been satisfactorily completed. Notice of Contractor's Settlement will be advertised via <br /> electronic media on the Colorado VSS website. <br /> GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program, General Bid Specifications 2009 which <br /> include General Conditions for Construction, Standard Work Specifications, and Standard <br /> Drawings and Figures are intended to complement these Special Conditions. Please refer to the <br /> Standard Work Specifications for all applicable types of work required in the Special Conditions. <br /> The General Conditions of the Contract apply to all work covered in the Special Conditions. <br /> PROJECT DATES <br /> The project is scheduled for construction between September 1, 2023 and October 20, 2023. <br /> This includes ten (10) days mobilization time. These dates are tentative and may change. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is fifty (50) calendar days after receipt of the Notice <br /> to Proceed. This includes ten (10) days mobilization time. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> A Notice of Award will be sent to the apparent low bidder within a reasonable time following the <br /> bid submission deadline. The Division of Reclamation, Mining and Safety must receive the <br /> following by the date specified in the award letter: <br /> (a) Executed Agreement, if required; <br /> (b) Fully-executed Performance and Payment Bonds, accompanied by <br /> appropriate Power of Attorney, if required; <br /> (c) Certificates of Insurance showing proof of required coverage and Additional <br /> Insured Endorsement; <br /> (d) Project Schedule; <br /> (e) AML Contractor Ownership and Control Form, if required; <br /> (f) Three-Way Agreement for Reclamation Activities, if required; <br /> Rev. 07/07/2023 <br /> Page 6 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.