My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-25_GENERAL DOCUMENTS - M1995005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1995005
>
2023-07-25_GENERAL DOCUMENTS - M1995005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:54 PM
Creation date
1/3/2024 2:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995005
IBM Index Class Name
General Documents
Doc Date
7/25/2023
Doc Name Note
Ocean Wave Project ( Alps Jct)
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(g) Measurements of any openings have been made in sufficient detail to establish <br /> general shapes and dimensions. The locations and dimensions of vertical and <br /> horizontal openings and depths of materials shown on the documents as waste <br /> material, soil and unconsolidated material and rock material are approximate <br /> measurements only and shall be verified by excavation. <br /> Article 36. DIFFERING SITE CONDITIONS <br /> (a) The CONTRACTOR shall promptly, and before such conditions are disturbed, notify <br /> the Principal Representative of: <br /> (1) Subsurface or latent physical conditions at the site differing materially from <br /> those indicated in the Contract, or <br /> (2) Unknown physical conditions at the site, of an unusual nature, differing <br /> materially from those ordinarily encountered and generally recognized as <br /> inherent in work of the character provided for in this Contract. <br /> The Principal Representative shall promptly investigate the conditions, and if he finds <br /> that such conditions do materially so differ and cause an increase or decrease in the <br /> CONTRACTOR'S cost of, or the time required for, performance of any part of the work <br /> under this Contract, whether or not changed as a result of such conditions, an <br /> equitable adjustment shall be made and the Contract modified in writing accordingly. <br /> (b) No claim of the CONTRACTOR under this clause shall be allowed unless the <br /> CONTRACTOR has given the notice required in (a) above; provided, however, the <br /> time prescribed therefore may be extended by the State. <br /> Article 37. CHANGES IN THE WORK <br /> The Principal Representative, without invalidating the Contract, may order extra work, or make any <br /> other reasonably related changes by altering adding to or deducting from the work; the contract price <br /> and time for completion of the work will be adjusted accordingly by written change order. <br /> All such work shall be executed under the conditions of the original contract except that any claim <br /> for extension of time caused by changes authorized in the change order shall be included in the <br /> written change order. <br /> The Principal Representative shall have authority to make minor changes in the work, not involving <br /> extra cost, and not inconsistent with the purpose of the work, but otherwise, except in an emergency <br /> endangering life or property, no extra work or change in the Contract Documents shall be made <br /> unless by a change order. No claim by the CONTRACTOR for an equitable adjustment hereunder <br /> shall be allowed if asserted after final payment under this Contract, approved by the Principal <br /> Representative. No claim for any change to the Contract sum shall be valid unless so ordered. <br /> The value of any extra work or change shall be determined in one or more the following ways: <br /> (a) By estimate and acceptance in a lump sum; <br /> (b) By unit prices named in the Contract; <br /> (c) By actual cost plus a fixed fee, or percentage, the latter agreed upon prior to starting <br /> the extra or changed work. <br /> Colorado Division of Reclamation, Mining and Safety <br /> Page 14 of 22 Pages <br /> Revised:9/17/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.