My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-25_GENERAL DOCUMENTS - M1995005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1995005
>
2023-07-25_GENERAL DOCUMENTS - M1995005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:54 PM
Creation date
1/3/2024 2:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995005
IBM Index Class Name
General Documents
Doc Date
7/25/2023
Doc Name Note
Ocean Wave Project ( Alps Jct)
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the adjusted bid price. The FHP of the desired equipment to be used must also be included <br /> under Item 8.0 on the Bid Schedule. <br /> Measurement and payment <br /> Payment for this task will be made at the unit price established in Item 8.0 of the Bid Schedule. <br /> The number of hours each piece and type of equipment used as directed by PROJECT <br /> MANAGER under this specification will be counted to the nearest one half hour. Such payment <br /> shall include the cost of all materials, accessories, labor, maintenance, operating supplies, <br /> salaries of operators, and any other expenses incidental to the operation of the equipment to <br /> complete the tasks as described in Item 8.0. No extra payment will be made for the use of the <br /> same equipment while performing work on other bid items on the Bid Schedule. No additional <br /> payment will be made for hauling equipment to or away from the work site except as may be <br /> proper under Mobilization & Demobilization. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br /> and ensure that each work item is completed and constructed to design specifications. The <br /> PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) <br /> on weekdays. Inspections will not be scheduled on weekend days or holidays without prior <br /> approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule <br /> inspections with the Project Manager so as not to delay the work. The following items must be <br /> observed and approved by the PROJECT MANAGER before proceeding with additional work: <br /> 1. PUF Closures: Depth to bottom form must be inspected prior to PUF installation. PUF <br /> plug must be inspected prior to backfilling. <br /> 2. Mono Plug Closures: Prepared depression and rockfill placement must be inspected <br /> prior to installing concrete. <br /> Rev. 07/07/2023 <br /> Page 20 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.