My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-21_GENERAL DOCUMENTS - P2007051
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2007051
>
2023-08-21_GENERAL DOCUMENTS - P2007051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:39 PM
Creation date
1/3/2024 2:18:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2007051
IBM Index Class Name
General Documents
Doc Date
8/21/2023
Doc Name Note
Avalanche #7 Bond Forefeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 5.0: Construct Boulder Barrier <br /> A boulder barrier will be constructed at the beginning of the mine access road adjacent to the <br /> stream to prohibit vehicular access. The barrier will be approximately ten (10) feet in length and <br /> require up to five (5) boulders to construct. Boulders to be used will be collected onsite and will <br /> be flagged by the PROJECT MANAGER. <br /> Measurement and Payment <br /> There will be no measurement for payment for this task. Payment for shall be for the lump sum <br /> bid price under Item 5.0 of the Bid Schedule. The lump sum bid shall include for labor, materials, <br /> equipment, fuel and all other items necessary and incidental to complete the task as described in <br /> Item 5.0. Payment will be made upon completion of this task and approval from the PROJECT <br /> MANAGER. <br /> Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.