My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-21_GENERAL DOCUMENTS - P2007051
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2007051
>
2023-08-21_GENERAL DOCUMENTS - P2007051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:53:39 PM
Creation date
1/3/2024 2:18:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2007051
IBM Index Class Name
General Documents
Doc Date
8/21/2023
Doc Name Note
Avalanche #7 Bond Forefeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and waste disposal facilities and locations CONTRACTOR and subcontractors will use while <br /> performing the work, including making any necessary arrangements for waste collection and <br /> disposal. Any fees or charges required to be paid for collection, transport or disposal of waste <br /> materials shall be paid by CONTRACTOR. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local laws, <br /> ordinances, rules and regulations relating to the work, the site, and any materials and/or <br /> equipment provided by CONTRACTOR. <br /> Several trees have fallen across the road and will need to be cleared to access the project <br /> site. Cleared trees shall be bucked into shorter lengths and scattered. Cutting or removing <br /> standing trees along the access road is not permitted. <br /> NOXIOUS WEEDS <br /> In an attempt to mitigate the spread of noxious weeds from one area to another, there will be a <br /> mandatory inspection of all equipment to be used during the course of construction at the project <br /> site. Prior to inspection, it is the responsibility of the CONTRACTOR to employ whatever cleaning <br /> methods are necessary to ensure that all equipment is free of soil, seeds, vegetative matter, or <br /> other debris that could contain or hold seeds. Equipment shall be considered clean when a visual <br /> inspection determines the equipment free of such material. The CONTRACTOR will be required <br /> to notify the PROJECT MANAGER in advance of mobilizing equipment to the project site to <br /> arrange for inspection. Disassembly of equipment components will not be required. <br /> Measurement and Payment <br /> Payment for Item 1.0 shall be reflected in a lump sum bid price under Item 1.0 on the Bid <br /> Schedule. Price bid shall include all the costs for mobilization of equipment to the site, <br /> transportation of the equipment within the project area, labor, fuel, final clean-up of the work site, <br /> demobilization, and any other items necessary to accomplish the requirements of this task. <br /> ITEM 2.0: SAFETY, HEALTH, AND ENVIRONMENTAL ACTION PLAN (SHEAP) <br /> The job will involve working around inactive mine features and hazards, and it is the responsibility <br /> of the CONTRACTOR to be aware of all OSHA regulations which apply to this contract. This task <br /> includes all the contractors expenses for employee time, labor, materials, and safety equipment <br /> and safety training necessary for preparing and executing a job safety plan. The Successful <br /> Bidder will be required to prepare the Project Safety Plan (SHEAP) and submit it for review and <br /> approval to the DRMS. The CONTRACTOR is required to develop and implement a Project <br /> Safety Plan in conjunction with project implementation. PROJECT MANAGER must receive the <br /> Project Safety Plan within five (5) working days of Notice to Proceed date. <br /> The Project Safety Plan must be submitted to: <br /> Craig Bissonnette <br /> PO Box 1619 <br /> Leadville, CO 80461 <br /> FAX (303) 832-8106 <br /> craig.bissonnette@state.co.us <br /> At a minimum, the plan MUST provide specific, detailed responses to the following list of safety <br /> concerns that are likely to present themselves during the course of Project completion. When <br /> developing the Project Safety Plan, please list specific types of equipment to be provided and <br /> specifically state the action to be taken by the CONTRACTOR, including subcontractor(s), in order <br /> to address the safety concerns. <br /> Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.