Measurement and Payment <br /> Measurement will be made at the unit price established in Item 5.0 of the Bid Schedule. <br /> Measurement for payment will be made per acre of area graded estimated at two acres. Payment <br /> will be approved by the Project Manager upon completion of this item. Such payment will be <br /> considered full compensation for all labor, materials, equipment, and all other items necessary <br /> and incidental to the completion of this bid item. <br /> ITEM 6.0 PURCHASE AND DELIVER COMPOST <br /> This item includes purchasing and delivering compost to the project area. The CONTRACTOR <br /> will procure 1,200 cubic yards of screened compost from a provider that is approved by the <br /> Project Manager prior to acquiring and delivering the compost. Compost must be Class A and <br /> weed free as evidenced by provider documentation. <br /> Measurement and Payment <br /> Measurement will be made at the unit price established in Item 6.0 of the Bid Schedule. <br /> Measurement for payment will be made per cubic yard of compost purchased and delivered <br /> estimated at 1,200 cubic yards. Payment will be approved by the Project Manager upon <br /> completion of this item. Such payment will be considered full compensation for all labor, <br /> materials, equipment, and all other items necessary and incidental to the completion of this bid <br /> item. <br /> ITEM 7.0 INCORPORATE ORGANIC MATERIAL AND COMPOST <br /> Following site grading as described in Item 5.0, the entire site will have organic material and <br /> compost incorporated into the top 12 inches of the entire graded area as well as the berm. <br /> Organic material will be located onsite and will be provided by the landowner. Organic material <br /> consists of dredged material from ponds. The location of the organic material is marked in orange <br /> on the Berm and Grade Map. Compost must be purchased and delivered to the site in Item 6.0. <br /> Compost must be Class A and be weed free. <br /> Prior to incorporating the organic material and compost into the ground, both materials must be <br /> spread across the site evenly to ensure consistent mixing. A total of 1,200 cubic yards of <br /> compost will be spread evenly over the entire 2 acre area including the graded site and the berm. <br /> After placement of the compost, approximately 500 cubic yards of organic material will be <br /> pulverized with an excavator or tracked machine and be evenly spread across the 2.0 acre area. <br /> Once evenly spread, the organic material and the compost will be thoroughly incorporated into <br /> the top 12 inches of graded ground with an excavator bucket. The final grade must maintain the <br /> grade achieved in Item 5.0 to allow positive drainage towards the storm water pond. <br /> Following the mixing of organic material and compost into the ground, the entire area will require <br /> machine compaction. A single pass of a tracked skid steer or approved equivalent is acceptable. <br /> See Berm and Grade Map. <br /> Page 13 of 16 <br /> 7/23/23 <br />