Laserfiche WebLink
This Item is to be included on the Bid Schedule but is not guaranteed, and will only be used if required <br /> and only if approved by the PROJECT MANAGER. <br /> Measure and Payment <br /> Payment for this task will be made at the unit price for the materials, equipment and operator <br /> required for the construction of one (1) structure with specifications outlined in Figure 4 and <br /> applied to the number of additional structures required to complete item 7.0. The price bid shall <br /> include all costs for labor, materials, equipment, and all other items necessary and incidental to <br /> complete the tasks as described in Item 9.0. Payment will be made upon completion of the <br /> described task and approval by the PROJECT MANAGER. <br /> Project Observation <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design specifications. <br /> The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 <br /> P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without <br /> prior approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule <br /> inspections with the Project Manager so as not to delay the work. The following items must be <br /> observed and approved by the PROJECT MANAGER before proceeding with additional work: <br /> 1. Mine Portal Closures <br /> a. Adequacy of closures with specified dimensions <br /> 2. Construction of Debris Consolidation Pad <br /> a. Dimensions of Pad and adequacy of safety berm <br /> 3. Reconstruct Stream Channel from Gold Run to River Level <br /> a. Adequacy and placement of in stream structures <br /> 4. Regrade Slopes at Gold Run and River Levels, Expand Sediment Pond and Install <br /> Diversion Ditches <br /> a. Final grade of slopes, size of sediment pond and location of diversion ditches <br /> 16 <br />