My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-07_GENERAL DOCUMENTS - M1981184
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981184
>
2014-10-07_GENERAL DOCUMENTS - M1981184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:52:18 PM
Creation date
1/3/2024 1:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981184
IBM Index Class Name
General Documents
Doc Date
10/7/2014
Doc Name Note
Red Arrow Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This Item is to be included on the Bid Schedule but is not guaranteed, and will only be used if required <br /> and only if approved by the PROJECT MANAGER. <br /> Measure and Payment <br /> Payment for this task will be made at the unit price for the materials, equipment and operator <br /> required for the construction of one (1) structure with specifications outlined in Figure 4 and <br /> applied to the number of additional structures required to complete item 7.0. The price bid shall <br /> include all costs for labor, materials, equipment, and all other items necessary and incidental to <br /> complete the tasks as described in Item 9.0. Payment will be made upon completion of the <br /> described task and approval by the PROJECT MANAGER. <br /> Project Observation <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design specifications. <br /> The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 <br /> P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without <br /> prior approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule <br /> inspections with the Project Manager so as not to delay the work. The following items must be <br /> observed and approved by the PROJECT MANAGER before proceeding with additional work: <br /> 1. Mine Portal Closures <br /> a. Adequacy of closures with specified dimensions <br /> 2. Construction of Debris Consolidation Pad <br /> a. Dimensions of Pad and adequacy of safety berm <br /> 3. Reconstruct Stream Channel from Gold Run to River Level <br /> a. Adequacy and placement of in stream structures <br /> 4. Regrade Slopes at Gold Run and River Levels, Expand Sediment Pond and Install <br /> Diversion Ditches <br /> a. Final grade of slopes, size of sediment pond and location of diversion ditches <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.