Measurement and Payment <br /> There will be no measurement for payment. Payment for this task shall be for the lump sum bid <br /> price under Item 2.0 of the Bid Schedule. This lump sum bid will cover all costs for developing <br /> and implementing the SHEAP, including writing and revising the plan as required, provisions <br /> and maintenance of safety equipment and personnel, conduct of daily safety meetings, and all <br /> other items necessary and incidental to fulfilling the requirements of this task and of the SHEAP. <br /> Payment will be made after approval from the PROJECT MANAGER. Payment for this task <br /> will be made only on the final invoice (before retainage). <br /> ITEM 3.0 MINE PORTAL CLOSURES <br /> The site contains three portals on the Mill, Gold Run and River Levels. All portals are currently <br /> closed and locked but will be modified to allow bat access and prevent unauthorized access by <br /> the public. Existing locks will be removed and relocked with locks provided by the Division of <br /> Reclamation, Mining and Safety. At all portals any pipes, water lines, etc. leading in or out of <br /> the portal are to be removed. The materials cost for modifying the closures shall be included in <br /> the bid price for Task 3.0. <br /> Mill Level Closure: The mill level adit is currently closed with an approximately two (2") inch bar <br /> stock gate fitted with an external frame, and locked with a chain and padlock. Spaces between <br /> the gate frame and the walls on either side of the adit currently allow for unauthorized access. <br /> Modified specifications from the IMRP General Bid Specifications, 2009 Section thirteen, <br /> Standard Drawing six will be used to incorporate the designs of the adit door closure and the bat <br /> closure bar stock crossbar alternative with improved DRMS safety requirements. Using number <br /> six (#6) rebar 1/4" anchored eight inches (8") minimum into competent rock and welded to the <br /> existing gate frame from the adit floor to the ceiling with six inch (6") on-center spacing. Grating <br /> measuring one and one quarter inches by one sixteenth inch (1 '/4"X 1/16") will be cut to fit <br /> between the existing frame and the competent rock perimeter of the opening, tack welded every <br /> other bearing bar to grate frame inside, allowing no access. The bar stock crossbar alternative <br /> bat closure has been modified by DRMS for improved safety (Figure 1). Using the existing door, <br /> vertical spacers from the bottom of the door to a height of thirty six inches (36") will be installed <br /> so no opening below thirty six inches (36") will have openings larger than 6" X 12". Above 36" <br /> the specifications from the IMRP General Bid Specifications 2009, Section thirteen, Standard <br /> Drawing six will be used. Existing private lock will be removed by CONTRACTOR and lockbox <br /> from bar stock crossbar alternative specifications from IMRP General Bid Specifications 2009, <br /> Section thirteen (13), Standard Drawing six (6) will be installed and locked with DRMS supplied <br /> locks. <br /> Gold Run Level Closure: The gold run level adit is currently closed with two (2) center opening <br /> 1/8" steel sheet doors and locked with padlock. The steel plating does not allow bat access. <br /> Modified specifications from the bat closure bar stock crossbar alternative IMRP General Bid <br /> Specifications 2009 Section thirteen, Standard Drawing six will be retrofit into the existing doors. <br /> Existing doors will have a centered twenty four inch wide by fifty nine inch (24" X 59") opening <br /> cut allowing for doors to swing with existing rail lines in place. Using two (2") pipe stock, support <br /> frames and the bat grates will be installed in both doors with improved DRMS safety <br /> modifications with vertical spacers installed on the bottom thirty six inch (36") of the gate to <br /> allow no opening to exceed six by twelve inches (6" X 12"). Existing locks will be removed by <br /> contractor and doors will be fit with modified lock box centered on doors and DRMS supplied <br /> locks to lock doors together. Mine carts currently on rail line will be pushed into adit prior to final <br /> closure. <br /> 9 <br />