My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-18_REVISION - M1985210
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985210
>
2023-12-18_REVISION - M1985210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 9:16:54 AM
Creation date
12/20/2023 8:31:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985210
IBM Index Class Name
Revision
Doc Date
12/18/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Douglas Bachli - Rocky Road Investments, Inc
Type & Sequence
SI2
Email Name
JLE
JPL
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task#003 Page 2 of 4 <br /> Payload Capacity: 54.38 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 24.20 LCY <br /> Heaped Volume: 31.40 LCY <br /> Average Volume: 27.80 LCY <br /> Adjusted Volume: 31.40 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 24.75 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 7.500 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-1201/o) 1.100 <br /> Adjusted Capacity: 8.250 LCY <br /> Job Condition Corrections: Site Altitude(11): 5500 feet <br /> Truck Loader Source <br /> Altitude Adj: 0.960 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.797 0.830 <br /> Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 3 passes <br /> Excavators and Front Shovels: <br /> Truck <br /> Machine Cycle Time vs. Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.550 mutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 3/4"to 6"diameter 0.00 0.000 (Cat HB) <br /> Stockpile: Dumped by truck 0.02 0.020 (Cat HB) <br /> Truck Ownership: Independently owned trucks 0.04 0.040 (Cat HB) <br /> Operation: Inconsistent operation 0.04 0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: 0.100 minutes <br /> Adjusted Loader Cycle Time: 0.650 minutes <br /> Net Load Time per Truck: 1.400 minutes <br /> Truck Cvcle Time: <br /> Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.625 Minutes <br /> Truck Load Time: 1.400 Minutes Adjusted for site altitude: 1.400 Minutes <br /> Truck Maneuver and Dump 1.00 Minutes Adjusted for site altitude: 1.042 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Hard, smooth, stabilized, surfaced,watered, <br /> maintained 2.0 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.