Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Replace Soil <br /> Site: Rocky Road Quarry Pennit Action: 2023 Insp Pennit/Job#: M1985210 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 11/27/2023 County: Larimer Filename: 003 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shiftbasis: I per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 740 <br /> -Loader: CAT 980H <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance-Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 25 25 25 25 <br /> Ownership cost/hour: $113.82 $61.69 $241.38 $241.38 $74.98 $11.35 <br /> Operating cost/hour: $81.91 $58.92 $35.98 $35.98 $13.82 $5.73 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA $0.00 $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $24.82 $35.97 $40.04 $40.04 $46.87 $0.00 <br /> Unit Subtotals: $220.55 $156.58 $317.40 $317.40 $135.67 $17.08 <br /> Number of Units: 2 1 1 1 1 1 <br /> Group Subtotals: Work: $597.68 Support: $634.80 Maine $152.75 <br /> Total work team cost/hour: $1,385.23 <br /> MATERIAL QUANTITIES <br /> Initial volume: 11,769 CCY Swell factor: 1.000 <br /> Loose volume: 11,769 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 87,000 Pounds <br /> CIRCES Cost Estimating Software <br />