My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-12_REVISION - M1977211
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977211
>
2023-12-12_REVISION - M1977211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:09:35 PM
Creation date
12/12/2023 3:06:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Revision
Doc Date
12/12/2023
Doc Name Note
Pikeview Blasting
Doc Name
Request for Technical Revision
From
Riverbend Industries, Inc.
To
DRMS
Type & Sequence
TR23
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K ZIT/ Buckley Powder Co. <br /> A Dyno Nobel Distributor <br /> D <br /> 42 Inverness Drive East,Englewood,Colorado 80112 USA Telephone:303-790-7007 Fax:303-790-7033 <br /> POWDER COMPANY <br /> i. not located in the permit area; or <br /> ii. Not owned nor leased by the person who conducts the mining operations. <br /> d. Weather conditions, including:temperature, wind direction, and approximate velocity; <br /> e.Type of material blasted; Range of material: granite, sandstone, limestone <br /> f. Sketches of the blast pattern including number of holes, burden spacing, and delay <br /> pattern. Sketches shall also show decking, if holes are decked to achieve different delay <br /> times within a hole; <br /> g. Diameter and depth of holes; <br /> h.Types of explosives used; <br /> i.Total weight of explosives used per hole and maximum weight of explosives used per 8- <br /> millisecond period; <br /> j. Initiation system; <br /> k.Type and length of stemming; <br /> I. Mats or other protections used; <br /> m.Type of delay detonator and delay periods used; <br /> n. Number of persons in the blasting crew; and <br /> o. Seismographic records where required including: <br /> i.Type of instrument sensitivity and the calibration signal of the gain setting or <br /> certification of annual calibration; <br /> ii. Exact location of instrument,the blast date and time, and the instrument <br /> distance from the blast; <br /> iii. Name of the person and firm taking the reading; <br /> iv. Name of the person and firm analyzing the seismographic record; <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.