Laserfiche WebLink
Table D-2 <br /> Task Description Time Needed (months) <br /> 1 Strip Topsoil 0.5 <br /> 2 Strip overburden from Pit 1 to stockpile 0.5 <br /> 3 Bring in crushing equipment,scales 0.5 <br /> 4 Mine Pit 1, reclaiming as mining progresses 150 <br /> S Mine Pit 2, reclaiming as mining progresses 9 <br /> 6 Mine Pit 3, reclaiming as mining progresses 9 <br /> 7 Mine Pit 4, reclaiming as mining progresses 9 <br /> 8 Reclaim final portion of Pit 4 5„ <br /> 9 Removal of all facilities 0.5 <br /> 10 Grade and prepare all reclaimed areas for "' '' <br /> revegetation prior to land development <br /> I ' <br /> 185 Months <br /> 15.4;''„u, Years <br /> I <br /> 3. Mine Facilities and Operation <br /> ' Will <br /> nsist I i� I i it <br /> The facilities for this mine site will be portable,and�Nill co of a!crushing/screening plant, portable <br /> ill 11 <br /> „I <br /> asphalt hot plant, portable truck scale,and house%officeraile'ri Mobile equipment will consist of dozers, <br /> front end loaders, pit trucks for hauling tops'o'il;and overburden, maintenance equipment, and off site <br /> I III I li I� <br /> trucks for hauling products off site.A wate�r truck"ill be usedl.to'water dust sensitive areas.The <br /> portable facilities will be placed as ind�icate'd'on Exhibit,D-1'Mining Plan Map,or within areas already <br /> mined. Only minor fuel storage,is,antici,pated'o,n site for refueling mining operations equipment.An <br /> approximately sized 500-galloO;steel tan klocate'd;!in al,stock tank secondary containment is planned to <br /> be located within the stool pile area.AKSPCC Plan will be filed for the site, if required.Tank inspections <br /> and ground inspections will'occur daily on the site.The Colorado Department of Public Health and <br /> Environment(CDPHE)w'ill;be notified i'n,.case of any spills over 25 gallons or a total of 40 gallons over the <br /> ;j , i II <br /> period of one yiear on site;Portabi,eiminin li.g equipment such as loaders,dozers,trucks,and excavators <br /> will be service'don' an;as;needed basis from portable service trucks making short visits to the site. Upon <br /> reclamation,'all equipm''e''nt will'be removed from the site. <br /> The ope"rator commits to clearly marking the permit boundary with stakes surveyed on site as required <br /> by the,DRMS.Theislite;wiHhU'sed existing roads to haul finished product to its final destination. It is <br /> planned that the material may be used to re-surface existing roads, make asphalt,or provide base <br /> material for an,y„prb'jects within an economically viable distance from the site. <br /> II x <br /> In addition to the listed above facilities,the following are ancillary to the mining and processing <br /> activities: <br /> • Parking for workers <br /> • Equipment storage and maintenance <br /> • Portable toils <br /> The project site will be used for import,export,storage,and resale of materials including sand,gravel, <br /> soil, rock, recycled asphalt,and recycled concrete with potential on-site processing during the life of the <br />