Laserfiche WebLink
Phase 2: <br /> Upon completion of mining in Phase 1,topsoil from Phase 2 will be used for a stormwater berm around <br /> the mining area for Phase 2. Remaining topsoil and overburden will be removed and used for <br /> reclamation of Phase 1 as needed. <br /> Phase 3: <br /> The process will be repeated with topsoil and overburden from Phase 3 used for a stormwater berm and <br /> for Phase 3 and reclamation material for Phase 2. Phase 3 may be used as a source of extra overburden <br /> for other mining phases as needed. Phase 3 is anticipated to have smaller gravel deposits than the other <br /> mining phase areas.The west and south sides of Phase 3 will be mined at 1H,,1V and will be reclaimed to <br /> 1V:3H slopes. " <br /> r <br /> Phase 4: <br /> As in the other mining phases,topsoil from Phase 4 will be used f8r:1a,storm"waterlb',erm, and overburden <br /> may be used for reclamation of Phase 3 as needed.This mini'ng'lphase will focus on aggregate deposits <br /> I1 II <br /> on the hilltops.As needed,excess overburden from other Phases will be used for the reclamation of <br /> Phase 4.After mining Phase 4 is complete,that phase wi,ll',be reclaimed,arid,all facilities will be removed <br /> from the permit area. Final site reclamation is discussed in Exhibit;,E`Aeclamation Plan. <br /> I il' it it m <br /> L jl <br /> III', n <br /> 2. Mining Timetables I p, <br /> ,, ;I �I � l;.Ili '' I <br /> The following timetables are a best estimate of the sequence of„operations for the life of the mine for <br /> the four Phases, assuming the anticipated,annual avers a of 55,'000 tons per year mined and sold. Due <br /> to wide fluctuations in demand,thesle''numb'e,rs may O'ange''and should only be taken as an <br /> 'll rl <br /> approximation. If large contrads';1are awarded to the sit <br /> m e, production could increase and reduce the life <br /> 'ii V1'.I " II 17 <br /> of the gravel mine.The maximu total tonnage sold from the site in any one calendar year is 200,000 <br /> tons. I.. l ry <br /> The following mining,,,timetla,ple'isibase'd;o,n a reasonable projection of average production rates. <br /> II I' <br /> m " II! 'II i, ail ;q fi l I� <br /> Phase MiningI�i'me , Reclamation Time <br /> 1 Begin"2024—2036(12 years) Ongoing <br /> 6 'I I ii III iI 1 <br /> 2 i Begin 2036,17 2037(1 years) Ongoing <br /> L <br /> 3 Begin 2037-2d37(1 years) Ongoing <br /> dl m <br /> III , <br /> 4 Begiri"2037-2038(1 years) 5.0 months <br /> The expected life of this operation is approximately 14-15 years,depending on market conditions. <br />