Laserfiche WebLink
DEMOLITION WORK <br /> Task description: Demolition of Facilities <br /> Site: Timnath Pit Permit Action: SO-1 Permit/Job#: M1989056 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 10/30/2023 County: Larimer Filename: 001 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adjustment: 94.70 % <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> Mine Office- 42,960 CF Bldg. (SN)demo./on- 42,960.00 CF $0.24 $10,203.00 <br /> Structure site disposal in existing <br /> pit or cut-Max. 10,000 <br /> ft.haul <br /> Mine Office-Floor 3,580 SF Floor,concrete, 3,580.00 SF $0.80 $2,859.70 <br /> demolition only, <br /> average reinforcing- 4 <br /> in.thick <br /> Maintenance Shop- 108000 CF Bldg. (SN)demo./on- 108,000.00 CF $0.24 $25,650.00 <br /> Structure site disposal in existing <br /> pit or cut-Max. 10,000 <br /> ft.haul <br /> Maintenance Shop- 7200 SF Floor,concrete, 7,200.00 SF $0.80 $5,751.36 <br /> Floor demolition only, <br /> average reinforcing- 4 <br /> in.thick <br /> Covered Storage 54075 CF Bldg. (SN)demo./on- 54,075.00 CF $0.22 $11,701.83 <br /> site disposal in existing <br /> pit or cut-Max. 200 ft. <br /> push <br /> Concrete Batch Plant 46080 Bldg. (MC)demo./on- 46,080.00 CF $0.42 $19,501.06 <br /> site disposal in existing <br /> pit or cut-Max. 10,000 <br /> ft.haul <br /> Aspahlt Batch Plant 2 Silos Haul tank to certified 2.00 EA $760.00 $1,520.00 <br /> salvage dump-3,000 to <br /> 5,000 gal.tank <br /> Various Conveyors 1000 LF'Long Conveyor,demolition, 6,000.00 CF $0.36 $2,160.00 <br /> X 3'W X 2 on-site disposal, <br /> existing it, 50 ft.push <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 860.50 (unadjusted): $79,346.95 location): $75,141.56 <br />