Laserfiche WebLink
Table 4. SL-22 Topsoil Verification Depths <br /> Depth <br /> Parcel Hole# (in) <br /> EP061 1 6 <br /> 2 5 <br /> WP026 3 9 <br /> 4 7 <br /> 5 6 <br /> WP027 6 7 <br /> 7 9 <br /> 8 10 <br /> WP028 9 7 <br /> 10 6 <br /> WP029 11 6 <br /> 12 6 <br /> 13 8 <br /> WP032 14 9 <br /> 15 6 <br /> Proposed Decision and Findings of Compliance November 3,2023 <br /> Partial Phase 11 Bond Release SL-22 Page 12 <br />