Laserfiche WebLink
Table 3. SL-22 Releasable Amount <br /> Task(Phase II) Cost <br /> Baclfill and Regrade WP032 (SL-9)* $ 55,621.00 <br /> Baclfill and Regrade WP026 (SL-13)* $ 994,025.00 <br /> Back ill and Regrade WP027 (SL-13)* <br /> Back ill and Regrade WP028 (SL-15) <br /> Baclfill and Regrade WP029 (SL-15) $ 504,271.00 <br /> Back ill and Regrade EP061 (SL-15) <br /> Haul/Regrade Topsoil from Pile 15B to West Pit $ 145,025.00 <br /> Reseed West Pit with Grazing Land Seed Mix $ 80 126.00 <br /> Reseed East Pit with Grazing Land Seed Mix $ 8,677.00 <br /> Weed Control- 10%of Reseeded Areas Four Times $ 11,823.00 <br /> Subtotal of Direct Costs $ 1,799,568.00 <br /> Indirect Costs(rounded to nearest dollar) $ 349,330.00 <br /> Total Amount $ 2,148,898.00 <br /> 25%of Total Amount(Phase Il) $ 537,225.00 <br /> *Based on acreage ratio between SLr22 and associated Phase I Release <br /> Proposed Decision and Findings of Compliance November 3,2023 <br /> Partial Phase 11 Bond Release SL-22 Page 11 <br />