Laserfiche WebLink
4.Topsoil and Overburden Handling <br /> Tops soil will be salvaged and stockpiled in the topsoil stockpile on the northeast part of the <br /> property or replaced directly on the 3H:1V slopes as they are created along the north and east <br /> sides of the area to be mined. Overburden will be hauled to the crusher to be incorporated in <br /> finished gravel products. The expected topsoil thickness is 4-8 inches. The topsoil stockpile will <br /> be seeded with the seed mix shown in Exhibit E. <br /> 5.Water Handling <br /> No change from the previously approved mining plan. <br /> 6.Schedule of Operations <br /> No change from the previously approved mining plan. <br /> 7.Delta County Impacts and Environmental Impacts <br /> No change from the previously approved mining plan. <br /> Moonscape Pit, November 2023 D2 <br />