Ninth Technical Revision(TR09)to Permit M-1973-021,Holcim-WCR,Inc.Morrison Quarry <br /> 3 Exhibit E — Reclamation Plan <br /> Rationale for Technical Revision <br /> Reclamation for the South Quarry and West Quarry above El. 6,600 remains unchanged from AM07. <br /> This section focuses on reclamation of the Satellite South Pit introduced in Exhibit D— Mining Plan. <br /> Exhibit F-1 shows reclamation within the South Quarry that is currently underway along the western <br /> slope, referred to as the South Quarry West Wall above El. 7,000. <br /> Satellite South Pit Reclamation Overview <br /> Satellite South Pit reclamation will include backfilling the pit to El. 6,600 with materials stockpiled on <br /> site in the Central Quarry or generated on-site if additional material is needed. Based on an initial <br /> 40HAOV bench configuration, the volume of the pit requiring backfill is approximately 2,648,832 yd3. <br /> Based on existing stockpile footprint at the quarry and reserve analyses completed for the West and <br /> South Quarries, it is assumed that 50% of the backfill material will be available in existing spoils <br /> stockpiles, and the remaining 50% of the backfill material will need to be generated from spoils <br /> during the course of West and South Quarry Mining operations. <br /> Once the Satellite South Pit has reached its final base elevation (estimated at El. 6,480), backfill <br /> activities will commence using fill material stockpiled in the Central Quarry. As needed, excavation <br /> and blasting will be done concurrently in permitted areas of the quarry to provide additional fill <br /> material and support continued backfill operations. As needed throughout backfill operations, <br /> stormwater will be managed in accordance with the Storm Water Management Plan (Rev. 6, June <br /> 2021). <br /> Once backfill has been completed to El. 6,600, final grading, restoration, and revegetation will be <br /> completed in accordance with the AM07 reclamation plan with one exception. The final grading of <br /> the South Quarry floor(El. 6,600) will be completed with a 3% slope (southwest or northeast) <br /> conveying stormwater to Outfall 003 and the main quarry access road which will remain per AM07. <br /> This final grading strategy combined with elevating the South Quarry floor to El. 6,600 removes the <br /> horizontal drain requirement recommended in AM07. <br /> Refer to Exhibit F - Reclamation Plan Map for the reclamation map and three cross sections <br /> summarizing the key attributes of the modified South Quarry reclamation plan. <br /> Schedule <br /> It is anticipated that mining will be completed in the Satellite South Pit in 2026. At this point, if <br /> additional mining is not anticipated or approved in a permit modification, reclamation work will <br /> commence. It is anticipated that this reclamation work, focused on backfill and compaction up to El. <br /> 6,600, will take up to 11 months to complete. <br /> October 2023 1 10 <br />