During permanent stabilization actions: <br /> • Attend a Site Pre-vegetation Conference if <br /> requested. <br /> • Complete the work as shown on the <br /> U <br /> Permanent Stabilization Site Maps, and <br /> y update the SWMP as needed. <br /> Final acceptance: <br /> w <br /> a • Remove elements of the Concrete Washout <br /> areas and aggregate Vehicle Tracking Pads. <br /> • Verify completion of all required items prior <br /> d to requesting partial acceptance from 208.10. <br /> +; • Attend the Stormwater Completion <br /> Walkthrough to inspect permanent <br /> stabilization work. <br /> 0 • Complete all punch-list items from <br /> v] walkthrough, including the removal of <br /> temporary control measures. <br /> • Continue to perform inspections until final <br /> acceptance and transfer of the permit is <br /> ocompleted. <br /> U <br /> s~ <br /> D <br /> 0 <br /> w <br />