My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-31_REVISION - M1973021 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-10-31_REVISION - M1973021 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 10:09:59 AM
Creation date
11/1/2023 8:46:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
10/31/2023
Doc Name Note
Attachment B - Appendices J-K - CDOT Erosion Control Manual
Doc Name
Request for Technical Revision
From
Holcim - WCR, Inc.
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECS Planning Objectives: <br /> Prior to the start of any ground disturbances: <br /> • Review the project Stormwater Water <br /> Management Plan (SWMP). <br /> • Study the existing drainage patterns of the <br /> project site drainage basin. Identify all potential <br /> run-on and project site outlets along with <br /> anticipated flows. <br /> • Submit a list of Potential Pollution Sources and a <br /> Spill Response Plan. <br /> • Provide TECS certifications at the <br /> Environmental Pre-construction Conference <br /> (h2o.codot.gov). <br /> • Establish the initial Areas of Disturbance(AD) <br /> on the SWMP Initial Site Maps. <br /> • Install control measures identified in the <br /> Narratives Section of the SWMP as required. <br /> During site construction: <br /> • Attend meetings and review schedules to <br /> determine when to implement the control <br /> measures shown on the SWMP Interim Site <br /> Maps. <br /> • Submit a method methodology for containing <br /> pollutant byproducts 10 days prior to starting <br /> concrete work(including existing concrete <br /> demo). <br /> • Understand how the implementation of the <br /> project construction activities will affect <br /> drainage patterns and the need for continual <br /> control measure adjustment. <br /> • Perform inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.