My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-12_INSPECTION - C1982057
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982057
>
2023-10-12_INSPECTION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 10:16:50 AM
Creation date
10/19/2023 11:31:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Date
10/12/2023
Doc Name Note
INSPSECTION COMPLETE
Doc Name
Inspection Report
From
DRMS
To
SENECA IIW
Report Quarter_Month
Oct
Inspection Date
10/10/2023
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 October 2023 C-1982-057/Seneca II-W Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 2 of 8 <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />R - Availability of Records <br />NA - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />NA - Other <br />NA - Processing Waste <br />R - Roads <br />Y - Reclamation Success <br />R - Revegetation <br />Y - Subsidence <br />Y - Slides and Other Damage <br />NA - Support Facilities On-site <br />R - Signs and Markers <br />NA - Support Facilities Not On-site <br />NA - Special Categories Of Mining <br />N - Topsoil <br /> <br />COMMENTS <br /> <br />This was a complete inspection of the Seneca IIW Mine, C1982057, operated by Seneca Property LLC. <br />The inspection was conducted, images analyzed and the report prepared by me, Robin Reilley of the <br />DRMS. Kevin Copeland, and Mike Howard mine representative, were present throughout the <br />inspection. No hydrologic or air quality issues were detected at the time of inspection. The weather <br />was partly cloudy and calm with temperatures around 70 degrees Fahrenheit. <br /> <br />PERMITTING ACTIONS in PROGRESS: <br />None at this time. <br /> <br />MAINTENANCE ISSUES IDENTIFIED <br /> <br />OUTSTANDING MAINTENANCE <br />1. Flume at Pond 15 requires resetting. <br />2. Slide at Pond 6 requires implementation of mitigation plan, as discussed during August <br />2023 inspection. <br />3. Culvert above pond 6 requires cleaning. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />Reclamation is complete and executed as permitted. Approximately 106.2 acres of Phase I released acres <br />remain for bond release. These acres comprise the main haul road, Pond 6 and the slide area above; <br />Ponds 15 and 16 and slide area on the east side of the site. Year nine vegetation sampling of the above <br />mentioned areas occurred in August 2022. Reclamation appears stable with well established vegetation. <br /> <br />SIGNS and MARKERS – Rule 4.02 <br /> <br />o The mine site identification signs observed at the mine access point at the main gate was <br />intact, displaying all required information: mine name, operator name, address, phone <br />number, DRMS permit number and contact information. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.