Laserfiche WebLink
Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.852 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4582 <br /> Adjusted unit production: 641.48 LCY/hr <br /> Adjusted fleet production: 1282.96 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.663/LCY <br /> Total job time: 25.69 Hours <br /> Total job cost: $21,855 <br />