Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Bachfill silt and freshwater ponds <br /> Site: Rich Pit Permit Action: 2023 Inspection Permit/Job#: M1985218 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 8/30/2023 County: Pueblo Filename: M218-001 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $241.38 NA <br /> Operating Cost/Hour: $143.92 100 <br /> Ripper own. Cost/Hour: $0.00 NA <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $425.34 <br /> Total Fleet Cost/Hour: $850.67 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 29,040 <br /> Swell factor: 1.135 <br /> Loose volume: 32,960 LCY <br /> Source of estimated volume: 98,010 sqft ponds x 8 ft deep=784,080 <br /> ft or 29040 CY <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,400.0 LCY/hr <br /> Materials consistency description: Wet,highly cohesive 0.8 <br /> Average push gradient: 0% <br /> Average site altitude: 4,550 feet <br /> Material weight: 2,700 lbs/LCY <br /> Weight description: Earth-Wet excavated <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.800 (CAT HB) <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 1.000 (AVG.) <br />