October 4, 2023 C-1996-083/Bowie No. 2 Mine RDZ <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 2 of 8 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />N - Availability of Records <br />Y - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />N - Other <br />R - Processing Waste <br /> <br />R - Roads <br />Y - Reclamation Success <br />R - Revegetation <br />N - Subsidence <br />R - Slides and Other Damage <br />R - Support Facilities On-site <br />Y - Signs and Markers <br />R - Support Facilities Not On-site <br />Y - Special Categories Of Mining <br />R - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />A partial inspection was conducted by Rob Zuber of DRMS on October 4, 2023. <br /> <br />Work on Gob Pile #3 has continued during recent weeks and placement of coverfill is close to completion. <br /> <br />During the inspection, BRL staff were working on placing a culvert at Curve 10 to prevent problems with the slide <br />area during the upcoming winter and spring of 2024. <br /> <br />The weather was partly cloudy and cool at the beginning of the inspection, and it became warmer by the end. The <br />ground was dry. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Some grading work has been done by BRL staff at the D Portal bench. It appears that more work is needed to <br />improve the drainage of runoff. <br /> <br />Six sediment ponds were inspected: B, C, D, F, J, and K. None of the ponds contained more than a small quantity <br />of water; several were completely dry. No significant problems were identified with embankments, spillways, <br />inlet channels, or other features of the ponds. <br /> <br />No problems with ditches were seen, apart from part of the large diversion ditch above Gob Pile #2. This ditch <br />requires sediment removal, just east of the large bend in the ditch. There was no sign that this ditch had <br />overtopped, but it will likely do that in the spring if not maintained. Basil Bear indicated by text that he plans to <br />clean this ditch during October of 2023. Also on Gob Pile #2, the sediment trap and channel below it appeared to <br />be functioning well.