My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (22)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 10:41:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.5 Red Creek Quarry Baseline Water Information
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1795
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />4-1 <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this docu ment. <br />Section 4 <br />Water Quality Monitoring <br />This section describes the water quality monitoring program for the baseline study including data <br />collection methods, personnel, and the quality assurance/quality control (QA/QC) program. Field <br />data and sampling forms are provided in Appendix C. <br />4.1 Baseline Monitoring Program <br />Water quality monitoring activities were conducted over five quarters beginning August 2022 and <br />ending July 2023. The monitoring program began in the third quarter of 2022 for the first quarterly <br />sampling event (Table 4-1). The remainder of the sampling events followed for the next four calendar <br />quarters. <br /> <br />Table 4-1. Timing of RCQ Baseline Water Quality Monitoring <br />Monitoring Quarter Calendar Quarter Dates Locations Sampled <br />First Quarter (Q1) Third Quarter (3Q) 2022 <br />08/09/2022-08/12/2022 Well 1, Well 3, Well 4 <br />09/01/2022 & 090/6/2022 Stilling Well, SW RC2, SW SEEP <br />Second Quarter (Q2) Fourth Quarter (4Q) 2022 12/06/2022-12/08/2022 Well 1, Well 3, Well 4, SW RC1, SW RC2, SW SEEP <br />Third Quarter (Q3) First Quarter (1Q) 2023 02/14/2023, 02/15/2023 & <br />03/07/2023 Well 1, Well 3, Well 4, SW RC1, SW RC2, SW SEEP <br />Fourth Quarter (Q4) Second Quarter (2Q) 2023 05/10/2023, 05/11/2023, <br />05/23/2023 Well 1, Well 3, Well 4, SW RC1, SW RC2, SW SEEP <br />Fifth Quarter (Q5) Third Quarter (3Q) 2023 07/12/2023-07/13/2023 Well 1, Well 3, Well 4, SW RC1, SW RC2, SW SEEP <br /> <br />Field personnel consisted of staff from BC collecting water quality samples; BC and Holcim staff <br />personnel downloading transducer data, and BC and Holcim staff installing and collecting data from <br />the surface water flume. <br />Water quality samples were collected from the existing monitoring wells installed to observe <br />groundwater levels surrounding Red Creek (Figure 3-2). The surface water quality monitoring <br />locations (SW RC1 and SW RC2) were selected to bracket upstream and downstream location of the <br />flume and the location of seeps to evaluate water quality and flow (Figure 3-3). The flow monitoring <br />station location was selected based on a visual reconnaissance of the stream, during which water <br />depth in the creek and the creek bed slope were measured. To attempt to monitor flow continuously <br />year-round, a location approximately 500 feet downstream of the seep was selected. <br />Frequency of monitoring at the Site was determined during a pre-application meeting with DRMS in <br />August 2022. According to discussions with DRMS, five quarterly water quality monitoring events are <br />required in order to establish a DRMS acceptable baseline water quality characterization.
The URL can be used to link to this page
Your browser does not support the video tag.