My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 10:37:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.1 Blasting Plan
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Originating Department: QUARRY Classification: <br />Work Instruction/SOP <br />E Q H&S <br />Y Y Y <br />Date Issued: 8/1/22 Revision Date: 03/8/2023 Control Number: PD. HAC Number: <br />Prepared By: Jeffrey Hauser <br />Title: Quarry Supervisor <br />Approved By: Oscar Mancera <br />Title: Quarry Manager Page 2 <br />Distribution: H:Quarry:Safety:Procedures_SOP <br />Subject: Drill And Blasting SOP <br /> <br /> <br />● Drill Pattern with available equipment. <br />● Communicate any safety concerns to contractor during drilling and blasting operations. <br />● Communicate the needs of company to contractor along with estimated blast schedule. <br />● Provide personnel when available for road blocks. <br />● Assist in misfires. <br /> <br />Drilling: <br />● Quarry manager/supervisor will communicate what location needs to be laid out for a drill pattern. <br />● Work place exam will be conducted at beginning of each shift. <br />● Make sure pattern area is suitable for layout i.e. (prep floor, move berms). <br />● Receive pattern sheet from contractor once laid out. <br />● Operate drill to produce bore hole for blast to appropriate depth and size of hole. <br />● If on Full Face/limestone bench collect cutting samples for lab analyses. <br />● Remove drill from pattern once finished and place completed drill pattern sheet in appropriate drop box for <br />contractor. <br /> <br />Blasting: <br />● Once pattern is finished the quarry manager/supervisor will inform contractor pattern is ready to be loaded <br />and blasted.
The URL can be used to link to this page
Your browser does not support the video tag.