My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-10-03_REVISION - M1977344 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2023-10-03_REVISION - M1977344 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 8:56:09 AM
Creation date
10/4/2023 10:37:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
10/3/2023
Doc Name Note
App 4.1 Blasting Plan
Doc Name
Request For Amendment To Permit
From
Holcim (US) Inc.
To
DRMS
Type & Sequence
AM2
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Originating Department: QUARRY Classification: <br />Work Instruction/SOP <br />E Q H&S <br />Y Y Y <br />Date Issued: 8/1/22 Revision Date: 03/8/2023 Control Number: PD. HAC Number: <br />Prepared By: Jeffrey Hauser <br />Title: Quarry Supervisor <br />Approved By: Oscar Mancera <br />Title: Quarry Manager Page 1 <br />Distribution: PD.16\200 Quarry <br />Subject: Drill And Blasting SOP <br /> <br /> <br />Quarry Drilling and Blasting Procedures <br /> <br />PURPOSE: <br /> <br />The purpose of these Standard Operating Procedures is to describe policies and procedures that will reduce the potential <br />of accidents while enhancing the productivity, cost effectiveness of the drilling, and blasting at Holcim. <br /> <br />Definitions: <br /> <br />Blast Area: The area of a blast within the influence of the loading operations for a given shot. This area will be <br />determined by the Blaster-in-Charge at the start of each blasting shift. <br /> <br />Safety Zone: Area established by lead blaster that keeps personnel and equipm ent out of harms way during the initiation <br />of the shot. <br /> <br /> <br />Holcim Responsibilities: <br />● Define what bench and location is to be laid out according to quarry manager/supervisor.
The URL can be used to link to this page
Your browser does not support the video tag.