Laserfiche WebLink
0010 <br /> General Shale <br /> Building The American Dreams <br /> Problem 3 Financial Warranty <br /> The financial warranty is not adequate to reclaim the site in accordance with the approved reclamation <br /> plan. <br /> Item Cost <br /> Backfill Highwalls $ 20,304.60 <br /> Backfill Pit $ 60,947.59 <br /> Place Topsoil $ 1,323.00 <br /> Equipment Mobilization $ 6,325.00 <br /> Seeding $ 32,240.00 <br /> Weed Control $ 960.00 <br /> Total $ 122,100.19 <br /> General Shale also would like to import brick to create the check dams. Approximately 500 tons will <br /> be stockpiled on the clay stockpile pad area for the life of the mine starting August 30, 2023. Given the <br /> low volume of material imported, the brick will not affect the post mining land use and will add additional <br /> fill material. General Shale will submit an inert fill notice for the scrap brick. <br /> EXHIBIT S - Permanent Man-made Structures <br /> Core Electric Cooperative is planning to build a transmission line along the south side of County <br /> Road 174 in 2023 or 2024. We have received a structure agreement from them and the <br /> agreement is enclosed. <br /> Enclosed are the following: <br /> 1. A signed copy of the inert fill notice. <br /> 2. Reclamation map <br /> 3. Mine Plan Map <br /> 4. Technical revision form <br /> 5. The technical revision fee of$ 216. <br /> 6. Structure Agreement from Core Electric Cooperative <br /> Please feel free to contact me with any questions at 303-783-3058 or by email at <br /> jason.mcgraw@generalshale.com. <br /> Sincerely, <br /> General Shale Brick, Inc. <br /> Jason E. McGraw P.E. <br /> Mine Supervisor <br />