My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-09-13_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2023-09-13_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:35:59 AM
Creation date
9/14/2023 10:26:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
9/13/2023
Doc Name
Adequacy Review Response
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR36
Email Name
DMC
LJW
ACY
TJ1
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval, Climax commits to providing an updated schedule to the Division with start date and <br /> expected milestones. <br /> Construction Phases <br /> • Pursuant to Rule 7.3.1(1),the below construction phases have been identified. <br /> • The construction phases in which inspections shall be conducted are: <br /> • Cutoff trench and slope excavation at new concrete cutoff structure location <br /> • Placement of compacted structural backfill <br /> • Install reinforced concrete for the seepage cutoff structure <br /> • Wet well manhole excavation and gravel bedding under manhole <br /> • Compacted backfill placement around manhole <br /> • 18-inch diameter corrugated intake pipe excavation and backfill bedding from wet well <br /> to containment pond <br /> • Wet well pump station floor slab (foundation gravel, concrete placement) <br /> • Wet well pump and piping install, leak test <br /> • 8-inch diameter HDPE discharge line from wet well to Clear Pond, excavation and <br /> backfill, leak test <br /> Quality Assurance and Quality Control <br /> • The facility certification and phased inspections (QA/QC)will be performed by W.W. Wheeler <br /> Engineers or their designee. In the specifications (see Drawing No. 6-807-00112) are the QA/QC <br /> requirements and standards; key verifications and inspections are summarized as follows: <br /> Required Verification and Inspection of Soils: <br /> • Verify materials below shallow foundations are adequate to achieve the design bearing <br /> capacity (periodic inspections) <br /> • Verify excavations are extended to proper depth and have reached proper material <br /> (periodic inspections) <br /> • Perform classification and testing of compacted fill materials (periodic inspections) <br /> • Verify use of proper materials, densities, and lift thicknesses during placement and <br /> compaction of compacted fill (continuous inspections) <br /> • Prior to placement of compacted fill, observe subgrade and verify that site has been <br /> prepared properly(periodic inspections) <br /> Required Verification and Inspection of Concrete Construction <br /> • Inspection of reinforcing steel and placement(periodic inspection) <br /> • Inspection of reinforcing steel welding <br /> • Inspection of anchors cast in concrete where allowable loads have been increased or <br /> where strength design is used (periodic inspection) <br /> • Inspection of anchors post-installed in hardened concrete members (periodic <br /> inspection) <br /> • Verifying use of required design mix(periodic inspection) <br />
The URL can be used to link to this page
Your browser does not support the video tag.