There will be more than enough material stockpiled from on-site materials to fulfill reclamation <br /> needs as the groundwater lakes take up the majority of the reclamation area. Table E-2 shows <br /> the volumes of topsoil and overburden required for reclamation and the material volumes that <br /> will be stripped and stockpiled. As shown, there is an excess of topsoil that is stripped versus <br /> what is required for reclamation. The stripped overburden does not meet the amount required <br /> for backfilling the pits. However, there will be an excess of topsoil and sand that will be more <br /> than enough to meet these requirements. These calculations were made assuming that the site <br /> has a uniform two feet of topsoil and two feet of overburden across all areas. Topsoil will be <br /> replaced in an average two foot layer across all non-pond disturbances, while overburden will <br /> be used to backfill the pit slopes from 1.5H:1 V to 3H:1 V. <br /> Table E-2 Reclamation Volumes <br /> Material Available on <br /> Pod Area Topsoil Overburden Topsoil Overburden Backfill <br /> (acres) Stripped(CY) Stripped(CY) Required(CY) Required(CY) <br /> 1 39.2 126,340 126,340 22,510 253,330 <br /> 2 14.9 48,050 48,050 13,870 141,330 <br /> 3 30.0 1 96,930 96,930 10,030 301,730 <br /> Screening 3.1 10,030 -- 10,030 -- <br /> Berm Area <br /> Totals 84.1 271,360 1 271,360 87,870 696,400* <br /> *Overburden reclamation requirements not met by the stripped overburden.There is an excess of topsoil <br /> (183,490 CY)and sand(>2M CY)present at the site that can be used to augment the backfill requirements. <br /> Overburden reclamation requirements will not met by the stripped overburden alone. <br /> Approximately 425,000 CY of excess topsoil and/or sand will be used to augment this shortage. <br /> There is an excess of topsoil and sand present at the site that can be used to augment the <br /> backfill requirements. The excess volume of topsoil and sand required for backfill are shown in <br /> Table E-3. While most of the sand that is excavated will likely be sold, BURNCO will keep at <br /> least the minimum required amount per pod for reclamation backfilling stockpiled on site. <br /> Table E-3 Additional Backfill Material Requirements <br /> Minimum RequirementsAugmented Backfill <br /> Pod 1 Pod 2 Pod 3 Total <br /> Volume C Volume Volume Volume <br /> Existing Overburden(from 126,340 48,050 96,930 271,320 <br /> Table E-2 <br /> Excess Topsoil(calculated 103,830 34,180 86,900 224,910 <br /> from Table E-2 <br /> Min.Sand Requirement 23,160 59,100 117,900 200,160 <br /> Total(CY) 253,330 141,330 301,730 696,390 <br /> Ewing Gravel Pit <br /> August 2023 E-2 Lewicki&Associates <br />