Laserfiche WebLink
EXHIBIT 13C <br />Volume 20 Page 13 Revision Date: 12/8/22 <br /> Revision No.: TR-157 <br /> <br />Pump House Building and Raw Water Pipeline <br /> <br />Tables 13C-18 through 13C- 20 provides items necessary to demolish the pump house building <br />and revegetate the raw water line installation. <br /> <br />Table 13C-18 Raw Water Pump Building Requirements <br />20’x32’x14’ <br />Steel Building <br /> <br />Precast <br />Concrete Vault <br />(6’x18’x8’) <br /> <br /> <br /> <br />Table 13C-19 Topsoil Requirements for Raw Water Pipeline* <br />Item Name Topsoil Volume <br />(cubic yards <br />Raw Water <br />Line 28,657 <br />*Topsoil will be windrowed directly adjacent to disturbance area. This volume includes where <br />the raw water line crosses Taylor Creek. <br /> <br /> <br />Table 13C-20 Revegetation Requirements for Raw Water Pipeline* <br />Item Name Acres to be <br />Disturbed <br />Acres to be <br />Reseeded <br />Raw Water <br />Line 36.37 36.37 <br />*These acres include where the raw water line crosses Taylor Creek. <br />