Laserfiche WebLink
EXHIBIT 13C <br /> Collom Access Roads <br /> Tables 13C-16 and 13C-17 demonstrate the items necessary to reclaim the Collom access roads. <br /> Locations of these access roads are shown on Figures Exh. 7-23-D1 through D5. <br /> Table 13C-16 Access Roads Topsoil Replacement* <br /> Avg. <br /> Haul Volume <br /> Name Avg. Grade (%) <br /> Distance (Cubic Yards) <br /> (ft) <br /> West Side Pond Access Road 2,000 2.0 2,688 <br /> East Side Pond Access Road 2,650 2.0 2,688 <br /> Topsoil Access Road 700 -3.0 3,761 <br /> *Please see Table 13C-5 for topsoil replacement on the Jubb Creek Access Road. <br /> Table 13C-17 Access Roads Revegetation Requirements* <br /> Acres Acres to be <br /> Access Road Disturbed Reseeded <br /> West Side Pond Access Road 2.0 2.0 <br /> East Side Pond Access Road 2.0 2.0 <br /> Topsoil Access Road 7.0 7.0 <br /> *Please see Table 13C-6 for revegetation requirements for the East Side Access Road and Jubb <br /> Creek Access Road. <br /> Volume 20 Page 12 Revision Date: 6/26/19 <br /> Revision No.: MR-205 <br />