My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-29_HYDROLOGY - M2015030
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2015030
>
2023-08-29_HYDROLOGY - M2015030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 1:41:59 PM
Creation date
8/29/2023 1:31:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
Hydrology
Doc Date
8/29/2023
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chavers Mining Resources Substitute Water Supply Plan 2023 Page 4 of 8 <br /> August 29, 2023 <br /> be measured by totalizing flow meters that can accurately show the monthly volume of dewatered water <br /> that is pumped and returns to the stream. Should it be determined by the Water Commissioner or Division <br /> Engineer that dewatering water is being diverted for any purpose by the operator and accounting is not <br /> adequate to show that 100 percent of the dewatering water is returned back to the South Platte River, <br /> the Applicant will need to account for any lagged dewatering depletions at the site. In addition, if it is <br /> determined by the Water Commissioner or Division Engineer that the pit is not continuously dewatered at <br /> a relatively constant rate then the Applicant must track depletions and dewatering return flows in their <br /> accounting and replace any dewatering depletions that are not offset by dewatering return flows. <br /> Replacements <br /> Out-of-priority depletions associated with the mining operation at this site and alluvial well will be <br /> replaced using fully consumable municipal return flows leased from the City of Aurora ("Aurora"). The <br /> applicant has entered into lease with Aurora signed December 9, 2021 and renewable through December <br /> 31, 2026. A copy of this lease has been provided by the applicant and is attached. Under the lease, <br /> water will be delivered to the outfall of the Robert W. Hite Treatment Facility (aka Metro Sewer, WDID <br /> 0200700) located on the South Platte River. The Hite Treatment Facility is located approximately 22 miles <br /> upstream of the Chavers Mine Resources site. The delivery schedule includes a transit loss of 0.5% per <br /> mile (11% for 22 miles) during the months of April through October and 0.25% per mile (5.5% for 22 miles) <br /> during the months of November through March. Conveyance loss for delivery of augmentation water to <br /> the South Platte River is subject to assessment and modification as determined by the Division Engineer. <br /> Any changes to the assessed conveyance loss will be communicated to the Division 1 Call List via email. <br /> Aurora may alternatively deliver water at other points along a reach of the South Platte River beginning <br /> at or below the Hite Treatment Facility extending downstream to a point at or above the location where <br /> the South Platte crosses the south section line of the E '/z of the SW '/a of Section 18, Twp. 1 N, Rng. 66W, <br /> 61h P.M. The Applicant must notify the Water Commissioner at least 48 hours prior to making replacement <br /> deliveries at a location other than the Hite Treatment Facility. <br /> Under the lease, 48.28 acre-feet are scheduled to be delivered from the City of Aurora lease from <br /> August 1, 2023 through December 31, 2023 for the Chavers Mining Resource site, as shown on the <br /> attached Aurora Lease. The plan can be extended through July 31, 2024 if Applicant provides a copy of <br /> the lease extension with the City of Aurora to this office by November 1. 2023 that includes adequate <br /> replacement water to replace all un-replaced depletions, after accounting for any transit losses subject <br /> to Condition no. 1. <br /> Conditions of A1212roval <br /> This SWSP is hereby approved in accordance with section 37-90-137(11), C.R.S. subject to the following <br /> conditions: <br /> 1. This SWSP shall be valid for the period of August 1, 2023 through December 31, 2023, unless <br /> otherwise revoked, or superseded by decree. The plan will be extended until July 31, 2024 if <br /> Applicant provides a copy of the lease extension with the City of Aurora to this office by <br /> November 1, 2023 that includes adequate replacement water to replace all un-replaced depletions, <br /> after accounting for any transit losses. If this plan is not decreed in water court by the SWSP <br /> expiration date, a renewal request must be submitted to this office with the statutory fee of $257 no <br /> later than November 1, 2023 (or June 1, 2023 if extended). If a renewal request is received after <br /> the expiration date of this plan, it may be considered a request for a new SWSP and the $1,593 filing <br /> fee will apply. <br /> 2. During the plan period of August 1, 2023 through December 31, 2023 (or July 31, 2024 if the plan is <br /> extended), the following amounts must not be exceed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.