My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-08-12_BONDING - M2009077
DRMS
>
Day Forward
>
Bonding
>
Minerals
>
M2009077
>
2023-08-12_BONDING - M2009077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 12:00:22 PM
Creation date
8/29/2023 11:59:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009077
IBM Index Class Name
Bonding
Doc Date
8/12/2023
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Tracy and Ed Grimes
Inspection Date
6/15/2023
Email Name
JR1
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#005 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: AURORA <br /> Total one-way travel distance: 80.00 miles <br /> Average Travel Speed: 65.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $5,247.46 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $36.48 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.23 1.23 <br /> Return Time(Hours): 1.23 1.23 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 3.46 2.46 <br /> JOB TIME AND COST <br /> Total job time: 6.92 Hours <br /> Totaljob cost: S5,284 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.